...
Project Type
Healthcare
Location
Santa Ana, California
Project Size
4,680 sqm
Date of Completion
----
Architect/Client
LA Architects

Premier Dental– Santa Ana

The team has been helpful not only in design but also during construction. The response and communications have been good and prompt. We appreciate Tamara and Bassam being very quick in responding to RFIs, especially during construction when things are moving very rapidly.

Mr. Poan Chen

Owner / Founder,
CSM Partners

Project Overview

Interior buildout of a dental clinic and ambulatory surgery center in Santa Ana, California. The project integrated clinical, surgical, and dental office functions within an existing commercial building.

This healthcare tenant improvement required a highly coordinated MEP engineering approach to support patient care, medical procedures, and specialized dental operations.

Project Scope

MEP engineering design involved the buildout of two primary program areas: an ambulatory surgery center and a dental office suite. The surgery center included operating rooms, recovery areas, clean and soiled rooms, medical gas storage, nurse station, and main reception. The dental office included consultation rooms, pediatric treatment rooms, sterilization areas, lab space, breakroom, and support areas.

The scope required integration of HVAC design, electrical design, and plumbing design to support clinical environments, infection control considerations, and equipment demands. Design efforts specially focused on system zoning, ventilation, and infrastructure coordination to meet healthcare requirements.

Services

Mechanical, Electrical and Plumbing Design

Highligths

MEP Engineering for Healthcare Architects Highlights

This healthcare tenant improvement demonstrates the importance of coordinated MEP engineering for facilities combining dental care and ambulatory surgical services.

  • MEP engineering for healthcare architects supporting a 4,680-square-foot medical tenant improvement.
  • Integrated engineering design for a dental clinic and ambulatory surgery center.
  • HVAC design supporting ventilation, environmental control, and healthcare operational requirements.
  • Electrical design coordinated for dental equipment, surgical functions, and clinical operations.
  • Plumbing design serving treatment rooms, sterilization areas, laboratories, and support spaces.
  • System zoning coordinated to accommodate multiple healthcare program areas.
  • MEP coordination minimized conflicts between building systems, medical equipment, and architectural layouts.
  • Constructability-focused engineering improved installation efficiency and reduced potential field conflicts.
  • Permit-ready MEP design supporting modern healthcare facility operations.

Explore more of our MEP engineering projects in Santa Ana: https://lamteaeng.com/projects

Related Projects

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.