...
MEP engineering for office renovation architects – ASCIP Building office modernization in Cerritos, California.
Project Type
Tenant Improvement
Location
Cerritos, California
Project Size
50,000 square feet
Date of Completion
----
Architect/Client
CDG Architecture + Interior Design

Alliance of Schools for Cooperative Insurance Programs (ASCIP)

Bassem is always very easy to reach and communicate with. When we encountered mechanical challenges on the Houston project, he was very responsive and knowledgeable in helping resolve them.

Joana Lo

Principal,
Lochte Architecture

Project Overview

MEP engineering for office renovation architects supported the modernization of the ASCIP Building in Cerritos, California, through the interior renovation of an existing two-story office building totaling approximately 50,000 square feet. The project upgraded workplace environments, collaborative meeting areas, shared amenities, and future tenant spaces to create a flexible commercial office environment capable of adapting to evolving tenant needs while extending the long-term value of the existing facility.

The office renovation was delivered as a phased tenant improvement, requiring close coordination between architectural, structural, and MEP engineering disciplines from Design Development through Construction Administration. The engineering approach emphasized constructability, tenant flexibility, and efficient integration of modern building systems while minimizing disruption to the existing building infrastructure and supporting long-term operational performance.

Project Scope

The MEP engineering scope included comprehensive mechanical, electrical, lighting, and plumbing design supporting a diverse range of office and amenity spaces throughout the building. Renovated areas included training rooms, boardrooms, conference rooms, private offices, fitness facilities, restrooms, lobby areas, outdoor courtyards, and future tenant suites. Each space required coordinated building systems that supported occupant comfort, operational flexibility, and future leasing opportunities while maintaining compatibility with the existing building infrastructure.

Mechanical engineering included HVAC design improvements to enhance indoor environmental quality, occupant comfort, and system efficiency throughout renovated office spaces. Air distribution, equipment zoning, and temperature control strategies were coordinated with architectural layouts and future tenant planning to provide flexible operation while maximizing the use of existing infrastructure. Mechanical system modifications were carefully integrated to support phased construction and minimize unnecessary alterations to the building.

Electrical engineering included upgraded power distribution, lighting systems, branch circuitry, and infrastructure serving office workspaces, collaboration areas, fitness amenities, and common areas. Lighting design was coordinated to improve workplace functionality while supporting energy-efficient building operation. Plumbing engineering included modifications to domestic water and sanitary systems serving renovated restrooms, fitness amenities, break areas, and supporting tenant spaces while coordinating new piping within existing building conditions.

A key component of the project involved MEP coordination across architectural, structural, and existing building systems. Mechanical ductwork, electrical conduit, lighting layouts, and plumbing distribution were carefully coordinated to reduce field conflicts and improve constructability throughout each phase of construction. The engineering team worked closely with the design team during Design Development and Construction Administration to address coordination challenges, support contractor installation, and maintain project schedule.

Because portions of the building were designed to accommodate future tenant occupancy, the engineering design incorporated flexible infrastructure capable of supporting future tenant improvements without significant system modifications. This coordinated approach helps reduce future renovation costs while providing a permit-ready MEP design that supports long-term adaptability, efficient building operations, and an improved workplace environment for current and future occupants.

Services

Mechanical, Electrical and Plumbing Design

Highligths

MEP Engineering for Office Renovation Architects Highlights

This office modernization project demonstrates how coordinated MEP engineering supports phased renovations while improving flexibility for future commercial tenants.

  • MEP engineering for office renovation architects supporting a 50,000-square-foot office modernization.
  • Interior renovation of an existing two-story commercial office building.
  • HVAC design improving occupant comfort, zoning flexibility, and operational efficiency.
  • Electrical and lighting design supporting modern office environments and shared amenities.
  • Plumbing design coordinated for renovated restrooms, fitness areas, and tenant support spaces.
  • Engineering coordination for training rooms, boardrooms, conference rooms, offices, lobbies, courtyards, and future tenant suites.
  • MEP coordination minimized conflicts between new building systems and existing infrastructure.
  • Constructability-focused engineering supported phased implementation from Design Development through Construction Administration.
  • Permit-ready MEP design providing flexibility for future tenant improvements and long-term building performance.

Explore more of our MEP engineering projects in Cerritos: https://lamteaeng.com/projects/

Related Projects

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.