Project Type
Office Building / Tenant Improvement
Location
Culver City, California
Project Size
30,000 square feet
Date of Completion
----
Architect/Client
RedCar Properties, Ltd.

3550 Hayden Building

It’s really about the relationship—we have a very strong, longstanding relationship and we’re very aligned in how we run projects. When issues came up with subcontractors, your team handled it well—coming up with solutions and adapting as needed.

Michael Namba

Head of Development,
Redcar Properties

The team has been helpful not only in design but also during construction. The response and communications have been good and prompt. We appreciate Tamara and Bassam being very quick in responding to RFIs, especially during construction when things are moving very rapidly.

Mr. Poan Chen

Owner / Founder,
CSM Partners

Project Overview

This major renovation of an existing office building required both partial demolition as well as an additional three story expansion. Work was later commissioned for a 9,000 square foot tenant improvement space of the entire first floor.

Project Scope

Extensive tenant finish-out coordination was needed for the additional lighting, IT requirements and low voltage design of this three-story building featuring an existing solar system. The structure included a ground level parking garage with double level car stackers, a second floor with multiple offices, kitchenettes, a common entrance area, mezzanine and outdoor heated patio space.

Services

Mechanical, Electrical, Plumbing and Low Voltage Design