Project Type
High-end Retail
Location
Beverly Hills, California
Project Size
2,030 sq ft.
Date of Completion
----
Architect/Client
Gruen Associates

Pomellato – Rodeo Dr (Full MEP)

I really enjoy working with Bassem. He is very easy to work with and always accommodating when challenges arise. He provides clear options and solutions, making the process smooth and collaborative.

Renee Salai

Gruen Associates

Lam+Tea Engineering provides competitive pricing with a great balance of cost and quality compared to other MEP firms. The Lam + Tea Engineers are down-to-earth, approachable, and easy to work with, which really stands out compared to other firms.

Alex Yamada

Senior Project Manager, Retail Development and Construction,
Probity International Corporation

Project Overview

This project involves the limited renovation of a high-end retail store at 445 North Rodeo Drive, Beverly Hills, California, including the mezzanine and a new chair lift. The remodel encompasses updates to lighting, power, HVAC, and plumbing systems across approximately 2,030 square feet of interior space. The design also targets LEED Gold certification, reflecting a commitment to sustainability and high-quality, efficient retail environments.

Project Scope

Our design services for this project cover Electrical, Mechanical, and Plumbing systems, providing a full suite of support for a high-end retail renovation.

Electrical Engineering: Includes review of as-built/record drawings, site observation, assessment of existing electrical capacity, and design of the complete interior electrical system. Services cover interior lighting circuiting plans, lighting control diagrams per Title 24, power circuit plans, empty conduit layouts for low-voltage systems, and preparation of single-line diagrams. Note: lighting fixture layout, specifications, and low-voltage wiring by others.

Mechanical Engineering: Includes review of as-built drawings, site observation, design of new HVAC equipment, air distribution layout, and specification of return and supply diffusers.

Plumbing Engineering: Includes review of as-built drawings, site observation, and design of plumbing fixtures for the new pantry and restroom.

Services

Mechanical, Electrical and Plumbing Design

Highlights

——

Related Projects

wp-tracker.com | 523: Origin is unreachable

Origin is unreachable Error code 523

Visit cloudflare.com for more information.
2026-10-28 09:21:44 UTC
You

Browser

Working
Phoenix

Cloudflare

Working
wp-tracker.com

Host

Error

What happened?

The origin web server is not reachable.

What can I do?

If you're a visitor of this website:

Please try again in a few minutes.

If you're the owner of this website:

Check your DNS Settings. A 523 error means that Cloudflare could not reach your host web server. The most common cause is that your DNS settings are incorrect. Please contact your hosting provider to confirm your origin IP and then make sure the correct IP is listed for your A record in your Cloudflare DNS Settings page. Additional troubleshooting information here.